
Description
This property is at the beginning stage of a new construction state-of-the-art ''green'' warehouse that emphasizes sustainability, where environmentally conscious construction and design is at the forefront. The project is slated for completion fall of 2023. (Please don't drive by and speak to current tenants). It will be a large 5000 SF warehouse shell made of concrete, featuring 2,000 SF of mezzanine office space with 3,000 SF of main floor warehouse space. Offices will be completely finished; all parking will be shared featuring electric vehicle (EV) charging stations and there will be a forklift charging station as well. 2 Roll up Garage door accesses with space for 18 wheel/semi-truck delivery for loading on shared dock. Floor drains for easy maintenance.100 Solar panels will be able to provide complete sustainability of electricity during the day and any excess power production can be sold to grid and used during the evening. All windows and doors will be high impact glass providing protection from the elements as well as providing cooling efficiency. Large integrated ceiling fans will provide additional cooling and air circulation for additional efficiency. South side has a loading ramp for semi-trailer truck to be able to complete unloading/loading completely onsite and covered.
-
0BEDS
-
0.4ACRES
-
0BATHS
-
01/2 BATHS
-
925SQFT
-
$0$/SQFT
School Ratings & Info
Description
This property is at the beginning stage of a new construction state-of-the-art ''green'' warehouse that emphasizes sustainability, where environmentally conscious construction and design is at the forefront. The project is slated for completion fall of 2023. (Please don't drive by and speak to current tenants). It will be a large 5000 SF warehouse shell made of concrete, featuring 2,000 SF of mezzanine office space with 3,000 SF of main floor warehouse space. Offices will be completely finished; all parking will be shared featuring electric vehicle (EV) charging stations and there will be a forklift charging station as well. 2 Roll up Garage door accesses with space for 18 wheel/semi-truck delivery for loading on shared dock. Floor drains for easy maintenance.100 Solar panels will be able to provide complete sustainability of electricity during the day and any excess power production can be sold to grid and used during the evening. All windows and doors will be high impact glass providing protection from the elements as well as providing cooling efficiency. Large integrated ceiling fans will provide additional cooling and air circulation for additional efficiency. South side has a loading ramp for semi-trailer truck to be able to complete unloading/loading completely onsite and covered.